Hiring a contractor to coordinate openings, utilities, ventilation, anchorage, trim, and commissioning for built-in kitchen appliances · service

kitchen appliance installation contractor

Coordinate appliance openings, power or gas, water, drainage, ventilation, anchorage, finish protection, testing, and handoff with a qualified installation team.

By the Service Nest editorial team

Need a local kitchen remodeling company now?

Call US 911 Kitchen Remodeling for service and availability in your area.

Call now: (201) 409-7055

kitchen appliance installation contractor: quick answer

Choosing a qualified installer is about coordinating a complete system, not simply placing a new machine in a cabinet opening. A good plan starts with the exact appliance specifications, then checks the cabinet opening, floor, counter, branch circuit or gas shutoff, water supply, drain connection, ventilation duct, delivery path, and service access. The crew should explain permits, protect the property, follow the installation manual, test the finished connections, and document what was verified. If the work involves gas, hardwired power, new plumbing, structural anchorage, or a modified ventilation duct, ask the appropriate licensed trade to handle that portion under local requirements.

The most useful first conversation is a scope review. Provide model numbers, the room plan, photographs of existing connections, finish materials, and the desired installation date. Ask which tasks are included, which are excluded, what must be corrected before delivery, and how the team will verify operation. A clear scope helps separate appliance placement from cabinet modification, countertop cutting, electrical work, gas work, plumbing, ventilation, trim, and inspection coordination.

Expect the final plan to depend on the product listing and current manufacturer installation manual. Two appliances with the same advertised width can differ in required clearances, connection locations, venting, support, leveling, and access. A contractor should resolve those details before the opening is made permanent.

What kitchen appliance installation should include

A useful project scope follows the appliance from the loading area to final operation. It should identify delivery inspection, packaging removal, movement through the home, floor and wall protection, placement, leveling, anchorage where required, connection, trim, startup, cleaning, and handoff. For a built-in refrigerator, that may also involve door swing, panel alignment, water supply, drain pan provisions, and air circulation. For a dishwasher, the scope may include the cabinet opening, mounting, water supply, drain connection, electrical connection, and protection against leaks. For an oven or cooktop, it may include counter or cabinet dimensions, branch circuit, gas shutoff, ventilation, and heat clearances.

Written scope should distinguish ready conditions from contractor-provided work. Ready conditions might include a structurally sound cabinet opening, finished flooring at the correct elevation, an accessible branch circuit, a correctly located gas shutoff, a water supply at the specified pressure, and a ventilation duct that meets the planned hood. If any of those are missing, the crew should describe a correction rather than quietly improvising. The appliance specification and installation manual should be attached to the scope or listed by model number and revision.

Ask whether the crew will verify dimensions before delivery or only after the appliance arrives. Pre-delivery verification can catch a shallow cabinet, an obstructed water supply, a misplaced receptacle, a blocked ventilation duct, or a delivery path that cannot accommodate the unit. It can also reveal that the existing trim or countertop must be altered by a different trade. The earlier a conflict is identified, the more choices remain.

Installation does not end when the appliance lights up. The handoff should cover leveling, stable attachment, connection integrity, operating modes, controls, unusual noises, alarms, filter access, shutoffs, care instructions, and warranty registration responsibilities. Request photographs of concealed work when access will be closed. Keep the appliance specification, installation manual, permits, inspection records, and test results with the property file.

Appliance installation hazards that change project scope

Hazards change the work because they affect who can perform it, what materials are acceptable, and which tests are necessary. A gas appliance raises questions about fuel piping, the gas shutoff, connector routing, leak testing, combustion air, and exhaust. A hardwired appliance raises questions about the branch circuit, disconnecting means, grounding, bonding, and protection. A water-using appliance raises questions about the water supply, drain connection, shutoff access, hose routing, and leak detection. A tall or heavy unit raises questions about anchorage, floor capacity, delivery handling, and door clearance.

Tip-over deserves a specific review for freestanding or slide-in cooking equipment. The U.S. Consumer Product Safety Commission range stability guidance explains that anti-tip brackets have been required on ranges since 1991, while also noting that special installation procedures can be disregarded. Its safety alert recommends checking that the bracket is attached and that the range is securely held by it. A visible fastener is not proof of engagement. The exact anti-tip bracket, substrate, elevation, leveling feet, and verification method must follow the model's installation manual. Do not load an open oven door or pull a connected appliance forward to investigate a bracket.

Ventilation can add another layer of risk. A hood that exhausts outdoors removes cooking moisture and pollutants, but a powerful exhaust fan can depressurize a home and affect natural-draft combustion equipment. The EPA remodeling guidance identifies kitchen range hoods as one force that can contribute to depressurization and backdrafting. That is why a ventilation duct, makeup-air approach, and combustion safety check may belong in the plan when the remodel changes the envelope or exhaust equipment.

Planning openings and utilities for a remodeled kitchen

Start with an appliance schedule that records each model, dimensions, weight, fuel or power type, required clearances, connection zones, ventilation needs, door swing, handle projection, and service access. Do not rely on a sales listing or a nominal size. Use the current installation manual and any approved product documentation. Save a copy with the project drawings so a later cabinet revision does not accidentally use an earlier dimension.

Measure the cabinet opening at the floor, counter, back wall, side walls, and top. Check for out-of-square conditions, filler strips, face frames, obstructions, plumbing chases, and supports. A cabinet opening may be wide enough at the front but too narrow behind the face frame. A kitchen appliance installation contractor should compare that opening with the appliance specification before the counter is permanently cut. A countertop may meet the width requirement while its overhang interferes with a door. A new floor can raise the appliance relative to the anti-tip bracket or change the gap beneath a dishwasher. Record the floor elevation and finish thickness before the final setting.

Map utilities in relation to the appliance, not just in relation to the room. Mark the branch circuit or junction box, receptacle, gas shutoff, water supply, drain connection, and ventilation duct on the plan. Confirm that each falls in the location permitted by the manual and remains accessible for service. Cords, hoses, and gas connectors must not be crushed, sharply bent, exposed to prohibited heat, or trapped behind a unit that cannot be safely moved. The cabinet opening and utility route should be reviewed together.

Countertop and wall materials also belong in the coordination. Stone, solid-surface, laminate, wood, tile, metal, and painted finishes have different cutting, support, sealing, and heat considerations. A cooktop cutout must match the listed template and leave the specified support and edge conditions. A wall oven may require ventilation openings or cabinet construction details. Ask who owns templating, cutting, edge finishing, structural support, and cleanup. A crew should not cut a finished counter based on a verbal dimension.

Service access is easy to lose in a compact kitchen. Check how filters, water valves, junctions, control boards, leveling feet, and shutoffs will be reached after trim and adjacent appliances are installed. A design that looks finished but requires demolition for a routine repair creates future cost and property damage. Preserve required openings and do not use an appliance cavity as general storage unless the manufacturer allows it.

Before work begins: documents, access, and protection

Collect the appliance specification, installation manual, use and care guide, warranty information, approved drawings, permit direction, and contact details for the authority having jurisdiction. Photograph existing conditions, especially the cabinet opening, floor, branch circuit, gas shutoff, water supply, drain connection, and ventilation duct. Note stains, corrosion, heat damage, loose trim, prior leaks, and signs that a previous appliance was forced into place. These records make responsibility clearer when multiple trades share the room.

Plan a safe delivery route. Measure doors, turns, stairs, elevators, thresholds, and finished openings. Protect flooring, counters, walls, and nearby cabinets with materials appropriate to the surface. Keep occupants, pets, and unrelated workers outside the work zone. The EPA recommends barriers and work practices that contain remodeling dust and pollutants, plus ventilation that prevents contaminants from spreading. That guidance is especially relevant when cabinetry, flooring, adhesives, sealers, or countertops are being modified in an occupied home.

Before a connection is opened, identify the shutoff procedure and the person responsible for it. Never assume a label is accurate or that a nearby valve controls the appliance. Keep a clear path to exits and do not stack boxes in front of electrical equipment, gas controls, or fire-safety equipment. If concealed conditions differ from the plans, pause for a documented decision.

When to hire a kitchen appliance installation contractor

Hire a kitchen appliance installation contractor when the work crosses beyond a simple, manufacturer-approved placement into coordinated construction. That commonly includes several appliances, built-in units, cabinet or countertop changes, a new branch circuit, gas piping, a new gas shutoff, water supply or drain changes, ventilation duct work, anti-tip anchorage, flooring changes, or permit and inspection coordination. A service visit may be enough for a like-for-like replacement with ready connections, but a remodel deserves a wider review.

Call early when the appliance has not yet been purchased. A contractor can compare the appliance specification with the room, confirm the cabinet opening, identify utility conflicts, and sequence work around delivery. This does not mean the installer chooses the product for you. It means the selected model is checked against the physical and technical conditions before money is spent on a permanent cutout or finish.

Call before demolition when an existing appliance shows a gas odor, scorching, melted insulation, water damage, recurring leaks, breaker trips, unstable movement, or an inaccessible shutoff. Those symptoms can indicate an underlying condition that a replacement will not solve. Do not move a connected gas or hardwired appliance to look behind it. Arrange qualified isolation and testing.

A contractor is also useful when ownership between trades is unclear. The cabinet crew may own the opening, the electrician the branch circuit, the plumber the water supply, the gas fitter the fuel connection, and the ventilation professional the duct. Someone still needs to compare their work to the appliance specification and installation manual. A written coordination role prevents gaps at the boundary between otherwise competent trades.

If you are asking a kitchen appliance installation contractor to manage the whole sequence, define the limits of that coordination. Confirm whether the company self-performs each trade, subcontracts it, or expects you to hire specialists. Ask who obtains permits, schedules inspections, receives the appliance, handles damage claims, completes commissioning, and returns for punch-list work. The answer should be in the proposal, not inferred from a sales conversation.

Comparing kitchen appliance installation by appliance type

Wall ovens need a cabinet opening, support, ventilation clearance, and a power connection that matches the model. Some are installed singly, while others are stacked or paired with a microwave. Verify the cabinet's material, framing, trim, door swing, control height, and service clearance. A wall oven should not be supported by decorative panels that were never designed for its weight. The branch circuit and junction arrangement must be handled according to the manual and local electrical requirements.

Cooktops depend heavily on the counter cutout and the space below. Check the exact template, edge clearances, drawer interference, heat protection, control access, and whether the planned oven below is an approved combination. Gas cooktops add a gas shutoff, connector, ventilation, and combustion considerations. Electric and induction cooktops add electrical capacity and heat-management considerations. An attractive counter opening is not enough if the appliance specification requires a different support or utility zone.

Ranges combine a cooking surface and oven in one floor-level unit. Review anti-tip anchorage, level, rear and side clearances, control reach, door swing, fuel or electrical connection, and hood capture. The CPSC recommends using an anti-tip device and keeping children from climbing on or near ranges. A delivery or flooring change can affect the relationship between the leveling feet and the anti-tip bracket, so verify it again after final placement.

Dishwashers require a properly sized cabinet opening, a stable mounting method, a water supply, a drain connection, and electrical work appropriate to the listing. Protect the floor and adjacent cabinet from leaks, and make the shutoff accessible. Confirm drain routing and high-loop or air-gap details with the installation manual and local plumbing rules. Run a controlled test, inspect underneath and beside the unit, and do not treat a dry first cycle as proof that a concealed connection will never leak.

Refrigerators need more than width. Check depth, hinge side, panel or trim requirements, ventilation space, leveling, anti-tip provisions for tall models, and the water supply if an ice maker or dispenser is included. Make sure doors can open far enough to remove bins and drawers. A built-in unit may require a dedicated enclosure and a different delivery sequence from a freestanding model. Keep the water supply and shutoff accessible rather than sealing them behind finished trim.

Microwave and ventilation appliances have their own installation relationships. An over-the-range microwave may require a specific mounting height, cabinet support, electrical location, and exhaust configuration. A hood needs a capture area, mounting height, filter access, duct route, termination, and sometimes a makeup-air strategy. Outdoor exhaust is not interchangeable with recirculation. ENERGY STAR guidance for certified homes calls for a local kitchen exhaust system that exhausts directly outdoors and meets applicable airflow criteria, but the program document does not replace local code or the selected product's instructions.

Phased installation can work when the sequence is documented. A kitchen appliance installation contractor can assign the final fit check after each surrounding finish is complete. Rough utilities and cabinet dimensions can be prepared first, but final openings should wait for confirmed product models. Installers should return after the counter, floor, trim, and duct are complete if those changes can affect fit or clearance. A phased plan needs a named owner for each measurement and a final person responsible for completion verification.

Controls, delivery paths, and everyday use

Daily usability belongs in the selection and placement decision. Front controls can be easier to reach but may be vulnerable to bumps or child access. Rear controls may require reaching over cookware. Touch controls can respond differently to moisture and grease. Door swings, drawer pulls, handles, and appliance heights affect traffic and collision risk. Test reach and clearance with the room empty of packaging, then reconsider after stools, rugs, carts, and frequently used storage are returned.

Delivery damage should be recorded before installation. Inspect doors, glass, trim, cords, connectors, panels, feet, and controls in good light. Photograph the serial label and any damage, and follow the seller's or manufacturer's reporting process. Do not install a visibly damaged appliance and hope a cosmetic claim will cover a later operating problem. Keep packaging until the inspection and return window requirements are understood.

Explain ordinary use at handoff. Show the main controls, lock features, hood controls, filter access, water shutoff, gas shutoff, electrical disconnect, and emergency steps. For induction, the U.S. Department of Energy overview describes pan detection and automatic shutoff features found on many models, but those features do not eliminate hot cookware, spilled oil, or the need to follow the manual. Safety features supplement attentive use.

Permits and manufacturer instructions for appliance installation

Permits and inspections are jurisdiction-specific. Ask the local building, electrical, plumbing, or mechanical authority what applies to the address and planned work. A contractor can often help identify the likely permit path, but the authority having jurisdiction controls the answer. Do not present a model code summary as a guarantee of local approval. Local amendments, adopted editions, historic-building rules, condominium requirements, and utility policies can change the process.

The installation manual is the model-specific source for dimensions, clearances, required support, wiring or gas connection, ventilation, leveling, anchorage, and startup. Keep the exact manual, not a generic guide for a similar product. Ask the kitchen appliance installation contractor to identify the manual revision used for the scope and closeout. If a contractor proposes a different connector, adapter, duct, fastener, trim method, or opening dimension, ask for written confirmation that it is approved. A product listing, certification mark, or familiar plug does not answer every installation question.

Code and product documents have different roles. A code sets requirements adopted by the jurisdiction. A listing and manufacturer manual describe the tested appliance and its installation conditions. An approved plan can add project-specific requirements. The safest coordination method records all three and resolves conflicts before construction. If a required clearance cannot be met, stop and obtain direction from the manufacturer, design professional, or authority rather than concealing the mismatch.

Inspection preparation should be practical. Keep the branch circuit, gas shutoff, water supply, drain connection, ventilation duct, anchorage, and required access visible or document concealed work before closure. Maintain invoices for materials, product manuals, permit numbers, inspection results, and test readings. Ask the inspector or contractor what must remain accessible after trim. Passing an inspection does not replace operating tests, and operating the appliance does not replace a required inspection.

How a qualified crew protects the property and occupants

Property protection begins before the truck arrives. The crew should confirm the route, protect finished surfaces, control dust, isolate the work zone, and plan where removed appliances and packaging will go. EPA remodeling guidance recommends barriers to contain dust and pollutants and keeping occupants away until cleanup is complete. Use that approach when cutting cabinets, modifying counters, applying finishes, or opening walls around utility routes.

Connection work should be orderly and observable. Qualified personnel identify the correct shutoffs, isolate the supply, inspect parts, use approved materials, and test before concealment. A gas shutoff should remain reachable. A water supply should have a usable isolation point. A branch circuit should be identified and protected according to the applicable electrical work. A ventilation duct should be supported, sealed with suitable materials, and routed to its approved termination. Do not accept a flexible hose, extension cord, improvised adapter, or unsealed duct merely because it fits.

Movement and anchorage require care. Protect the floor while moving a heavy appliance, but do not use a pad that changes the finished elevation or prevents a bracket from engaging. Secure tall equipment as specified. For a range, verify the anti-tip bracket after the unit is leveled and again after it is pulled for service. For a tall refrigerator, follow the model-specific anchorage and clearance requirements. Do not use adjacent cabinetry as an anchor unless the product instructions permit that method.

Cleanup is part of safety. Remove sharp packaging, fasteners, dust, glass fragments, wet materials, and unused chemicals. Make sure ventilation openings, controls, filters, drains, and service panels are not blocked. The final walkthrough should distinguish normal startup odors or sounds described by the manual from symptoms that require shutdown. Occupants should know who to call and which supply to isolate without opening a hazardous compartment.

Questions for electricians, plumbers, and cabinet crews

Ask the electrician which circuit, connection method, disconnect, grounding, bonding, and protection were verified, and where the documentation will be kept. Ask the plumber how the water supply and drain connection were routed, where the shutoff is, and how the first leak inspection was performed. Ask the gas professional how the gas shutoff, connector, pressure, and leak test were addressed. Ask the cabinet and countertop crew how the opening, support, trim, and finish clearances were matched to the appliance specification.

Ask the ventilation professional where the ventilation duct terminates, how its size and route were selected, how the hood is supported, how filters are accessed, and whether the home's pressure and combustion equipment were considered. Ask the lead coordinator who compares all of those answers with the installation manual. If everyone assumes another trade owns the final check, the gap is still yours.

Request the names and license or registration details required for the work in your jurisdiction, proof of insurance appropriate to the contract, written change orders, and a clear warranty division. Credentials do not prove workmanship, but reluctance to identify the responsible trade is a warning sign. Keep questions factual and ask for answers in the proposal or closeout record.

Changes that affect a kitchen appliance installation estimate

An estimate depends on more than appliance count. Important variables include the number and type of appliances, model-specific clearances, cabinet opening work, countertop material, floor elevation, delivery distance, stairs or tight turns, wall access, branch circuit length, gas piping, water supply, drain connection, ventilation duct length and fittings, anchorage, trim, finish protection, disposal, permits, inspections, testing, and return visits. The estimate should say which assumptions make the price change.

Ask for an itemized scope rather than a single unexplained total. Separate appliance placement from electrical, plumbing, gas, ventilation, cabinet, countertop, flooring, carpentry, disposal, permit, and commissioning tasks. This lets you compare proposals that use different trade boundaries. It also makes a change order understandable if the wall contains an unexpected pipe, the cabinet opening is undersized, or the selected hood requires a different duct route.

Site conditions create uncertainty. An out-of-square wall, damaged subfloor, inaccessible shutoff, undersized branch circuit, corroded valve, blocked ventilation duct, asbestos or lead concern, water damage, or structural obstruction can require specialist evaluation. A responsible proposal states that those conditions will be investigated and priced through an agreed process. The kitchen appliance installation contractor should identify who performs that investigation and who approves the result. It should not promise a fixed result while omitting obvious unknowns.

Material options deserve their own line. Connector, valve, duct, fastener, trim, sealant, mounting hardware, water line, drain component, and protective material choices must be compatible with the appliance specification and applicable rules. The lowest-cost material is not automatically acceptable, and the most expensive material is not automatically necessary. Ask what is included, who supplies it, and how substitutions are approved.

Schedule can affect estimate factors as well. A crew may need to return after the countertop is templated, after flooring is complete, after an inspection, or after a replacement part arrives. Clarify whether coordination, storage, delivery damage inspection, haul-away, and commissioning are included. If you ask a kitchen appliance installation contractor to manage corrections by other trades, specify whether that is project management, self-performed work, or a separate allowance.

What a complete estimate should make visible

A complete estimate identifies the property, appliance models, scope, exclusions, assumptions, materials, labor, permits, inspections, schedule, payment stages, change-order method, cleanup, disposal, testing, closeout documents, and warranty contacts. It should name the party responsible for each utility and for final completion verification. It should also state what happens if the appliance arrives damaged or does not fit the approved opening.

Compare proposals by questions, not just totals. Does one include a site measure while another assumes dimensions? Does one include the gas shutoff and leak test while another stops at delivery? Does one include the ventilation duct and outdoor termination? Does one include cabinet support and countertop repair? A lower number may simply transfer work to you. A higher number may include necessary coordination, but it still needs an intelligible scope.

Before approving a change, ask what condition triggered it, which document supports it, what work is added or removed, how it affects schedule, and whether a permit or inspection changes. Keep signed changes with the original proposal. Verbal additions are difficult to reconcile when several crews are involved.

Warranty handoff and workmanship questions

Separate product warranty from installation workmanship. Your kitchen appliance installation contractor should state which installation conditions and corrections remain within the workmanship promise. The appliance manufacturer controls product warranty terms, exclusions, registration requirements, service channels, and approved installation conditions. The installer controls the workmanship promise stated in the contract. A cabinet maker, electrician, plumber, gas professional, and ventilation contractor may each have a different warranty scope. Ask who responds when a symptom could involve both the appliance and the installation.

At handoff, record the model and serial numbers, purchase date, installation date, permit and inspection references, installer names, manuals, settings, test results, hidden-work photographs, and warranty contacts. Note the exact anti-tip bracket, branch circuit, gas shutoff, water supply, drain connection, and ventilation duct arrangements where those details may matter later. This record can prevent a service technician from repeating destructive investigation or moving a connected unit without a plan.

Ask what the installer will return to correct and what is excluded. Examples include a leaking water connection, failed drain test, loose trim, unstable mounting, damaged finish, incorrect alignment, an inaccessible shutoff, a connection that does not match the manual, or a hood that does not operate as specified. Do not accept a promise that all future problems belong to the manufacturer. Installation defects and product defects can overlap.

Warranty language should not encourage unsafe use. It should not require an occupant to bypass a safety device, open a gas connection, alter wiring, or continue using an appliance that rocks, leaks, sparks, smells of gas, trips a breaker, or triggers an alarm. For those conditions, follow the appropriate shutoff and emergency guidance, then contact the responsible qualified professional or utility from a safe location.

Schedule a final review while the crew is still available. Operate every function the manual says to test, inspect the cabinet opening and adjacent finishes, check the floor and trim, confirm filter and shutoff access, and verify the documentation package. A signed completion record should identify unresolved items and the person responsible for closing them.

kitchen appliance installation contractor hiring checklist

Use this checklist when comparing a provider or preparing a remodel:

  • Record the exact appliance models, model-specific installation manual, dimensions, weight, fuel or power type, clearances, ventilation needs, and service access.
  • Ask the provider to measure the cabinet opening at multiple heights and depths, including floor elevation, counter overhang, face frames, fillers, and adjacent door swings.
  • Map the branch circuit, receptacle or junction box, gas shutoff, water supply, drain connection, ventilation duct, and required access before finishes are closed.
  • Confirm who owns cabinet modification, countertop cutting, flooring changes, structural support, trim, electrical work, plumbing, gas work, ventilation, disposal, and cleanup.
  • Require a written scope with ready conditions, exclusions, assumptions, materials, schedule, permits, inspections, tests, change orders, and return visits.
  • Ask which work is self-performed and which is assigned to an electrician, plumber, gas professional, cabinet crew, countertop fabricator, or ventilation specialist.
  • Verify the credentials, insurance, references, and local permit responsibilities required for the specific work and address.
  • For ranges and other applicable equipment, identify the exact anti-tip bracket or anchorage, substrate, installation position, and engagement check.
  • Confirm that the ventilation duct terminates as planned, that the hood is supported and serviceable, and that pressure or combustion concerns are assessed where relevant.
  • Plan delivery access and property protection, then inspect doors, glass, panels, controls, cords, connectors, feet, and serial numbers before installation.
  • Have qualified trades isolate supplies, use approved materials, follow the installation manual, and test electrical, gas, water, drain, ventilation, and operating functions as applicable.
  • Photograph concealed work before closure, including the cabinet opening, branch circuit, gas shutoff, water supply, drain connection, ventilation duct, and anchorage.
  • At handoff, verify level, clearances, stable attachment, door and drawer movement, controls, filters, shutoffs, alarms, and every required operating mode.
  • Collect permits, inspection results, test readings, manuals, warranties, model and serial records, maintenance instructions, and emergency contacts.
  • Agree on product warranty, workmanship warranty, responsible trade, response process, and unresolved punch-list items in writing.
  • Stop and obtain qualified help for gas odor, sparking, shock, water damage, a hot connection, unstable equipment, abnormal combustion, repeated breaker trips, or an alarm.

The right kitchen appliance installation contractor leaves you with more than a working appliance. You should have a coordinated installation, a protected room, accessible shutoffs, documented tests, clear warranty ownership, and a record that another professional can understand. Review the documents once more before the first ordinary use, and keep them available for maintenance or future remodeling.

Continue researching

Ready for the next step?

Talk through your project with a trusted kitchen remodeling company

Ask US 911 Kitchen Remodeling about availability, scope, and what information to prepare before requesting service. Calling directly is the fastest way to discuss your specific needs.

Discuss my project

(201) 409-7055